Elon Musk Has Two Las Vegas Casinos Asking For Boring Company Tunnels
There are additional phases planned; the completed phase there will have about 68 miles (109 km) of tunnels and 55 stops, including stops at Harry Reid International Airport, Allegiant Stadium, the Oakland A's future Las Vegas Stadium, Brightline West Las Vegas Station, UNLV, and downtown Las Vegas. The Loop connects to the Las Vegas Monorail at the Boingo Station, LV Monorail station at the corner of Paradise Road and East Desert Inn Road at an Island above East Desert Inn Road. The loop is 1.7 miles (2.7 km) in length and covers a 25-minute walking distance. Redeem these bonus codes BEFORE you make a deposit to claim your bonuses.